Put in the Coir Matting within the trench. Put at the least 12 inches in the roll higher than the trench (even further up the slope). Area Every staple a couple of foot aside Within the trench BioD-Roll Coir Logs: Cylindrical constructions stuffed with coir fibers, these logs stop wave https://shaneptuqp.blog-ezine.com/34131614/coir-door-mats-for-dummies