Penmann has completed a significant HVAC upgrade at Nutricia’s Liverpool-based production site, providing a bespoke ventilation and climate control system built to comply with strict hygiene and production standards. The project encompassed the design, supply, installation and commissioning of high-specification HVAC systems across non-production, Medium Care (MC) and High Care https://bookmarkquotes.com/story20771471/the-penmann-team-completes-major-hvac-upgrade-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2