1

High-Efficiency 400 kW Chiller Installation Secures Fifty Thousand Pounds Yearly Energy Savings and 200 Tonnes CO₂ Saving

News Discuss 
Project Highlight Newsome has successfully finalised the installation and commissioning of a high-performance 400 kW chiller at a well-known confectionery manufacturing site in York. Designed to reinforce ESG targets, the installation boosts system dependability while cutting overall power consumption and CO₂ levels. https://thegreatbookmark.com/story20743123/energy-efficient-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story